Green Pack technology for electric MEWPs as the access industry cuts emissions and running costs.
Across the UK access industry, businesses are facing a clear challenge. The pressure is on to cut emissions, reduce site noise, and future-proof fleets to win green tenders. However, moving straight to a fully electric MEWP setup is not always practical for everyone. Site conditions, unpredictable hours, and heavy operational demands still require serious flexibility. That is exactly where Green Pack technology bridges the gap.
Available as an optional extra on our van-mounted platforms, Green Pack offers a highly practical stepping stone towards electrification, without forcing you to compromise on performance or reliability.
Think of Green Pack as a smart auxiliary power system. It allows your van-mounted cherry picker to operate the boom electrically when you need it most.
Instead of leaving the vehicle engine idling to power the hydraulics, the platform runs on a much cleaner, quieter energy source. This setup gives your operators total control. They can drive to the site using the standard engine, then switch to a sustainable electric mode to complete the actual work at height.
One of the biggest daily advantages of the Green Pack system is the drastic noise reduction. Traditional diesel platforms leaving their engines running can be a massive headache in residential streets, city centres, schools, and hospitals. It is also a limiting factor for early morning or late-night call-outs. By switching to electric operation for the boom, your team can work almost silently.
For your business, this means fewer complaints from locals, much greater flexibility with out-of-hours contracts, and stronger relationships with your clients. In many cases, having a quiet machine is the exact advantage you need to win work in noise-sensitive zones.
Sustainability has moved from being a corporate buzzword to a strict tender requirement. Green Pack helps you meet these new standards by significantly reducing site emissions during operation. This is an absolute game-changer for urban projects with strict environmental controls, indoor working environments, or simply demonstrating your commitment to a lower carbon footprint.
Going green also needs to make financial sense, and this technology delivers on that front. Running the platform electrically slashes your idle fuel consumption, leading to highly noticeable savings at the pumps over time. Because the main engine spends less time idling, you will also see reduced engine wear and tear, effectively lowering your ongoing maintenance costs. Add in the ability to bid for and win contracts that strictly require low-emission equipment, and the return on investment becomes very clear.
This technology really shines in sectors where keeping a low profile is essential.
While a fully electric fleet might be the ultimate destination for many businesses, Green Pack is the perfect bridge. It lets you introduce electric MEWP capabilities to your team while keeping the rock-solid reliability of a traditional diesel engine for the long motorway drives between jobs.
Of course, if you are ready to make the full leap, CPL offers fully electric MEWPs across our range, including van mounts and tracked spider lifts. These are built for true zero-emission operation. But we also know that site realities can bite. That is why many of our electric models come with hybrid or hydraulic alternatives, ensuring your operators always have a reliable backup and never get caught out when a job urgently needs finishing.
Related news
Event
See the KL17p for the first time in the UK. CPL is teaming up with Thomas Nagy on a joint stand at Highways UK 2026, 14–15 October at the NEC.
21 August 2026
Read more →
Advice
MEWP compliance is tightening across the UK. Find out how type approval, LOLER and IPAF certification affect tenders, insurance and procurement.
17 August 2026
Read more →
Advice
CPL is exhibiting at FutureScape 2026, Farnborough, 13-14 October. See the KA14 Pickup MEWP and tipper platform live with demos on the day.
14 August 2026
Read more →